OBJECTIVE
Increase plant capacity; upgrade utility infrastructure
HIGHLIGHTS
Project expanded an existing building and installed a new Vacuum Induction Melt Furnace at the customer’s existing plant. Specifically, this included General Demolition, Civil Site work, Underground Utilities, Concrete Foundations – Main Building, Concrete Foundations -Cooling Tower, Concrete slabs, Structural-Building Framing and Siding, Overhead Cranes, Miscellaneous Platforms, Cooling tower Support Steel, Cooling Tower Pump House, Major Equipment Installation, Interior Piping, Cooling Tower Equipment Installation, Cooling Tower Piping, Heating and Ventilation, Lighting, Electrical Power Distribution and Utilities, and finally Grounding and Lightning Protection. Also provided assistance in permit preparation and acquisition.