Chemical Facility Expansion

OBJECTIVE

Client added production capability at their NJ Facility to produce an additional 40 million pounds per year of Specialty Chemical. Equipment additions and modifications include feed modifications from an existing Unit feeding a Vacuum Neutralizer, High Shear Mixer, Staging Tank, and Truck Loading. Javan provided Process, Mechanical, E&I, and Structural engineering and design and Construction Management.

LOCATION

New Jersey

PROJECT SIZE

$2,000,000

SERVICES

  1. Preliminary Engineering
  2. Detailed Design
  3. Procurement
  4. Construction Management (EPCM)
Back to all projects

Contact

465 Maryland Drive, Suite 100
Fort Washington, PA 19034

1800 Pennbrook Parkway, Suite 102
Lansdale, PA 19446

3000 RDU Center Drive, Suite 117
Morrisville, NC 27560

Engage

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industrys standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

Ⓒ Javan Engineering, A CHA Company, 2023. All Rights Reserved.

Privacy Settings
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy
Youtube
Consent to display content from Youtube
Vimeo
Consent to display content from Vimeo
Google Maps
Consent to display content from Google