OBJECTIVE
Renovate an existing cGMP lab suite and associated infrastructure to provide adequate containment for the handling of potent compounds.
HIGHLIGHTS
Included the complete renovation of the existing space to include the design of anterooms, clean and dirty areas and provisions for cGMP requirements. This included modifications to the existing HVAC system controls in order to provide a system which could track the CFM’s being supplied to the various rooms in order to validate the design. The controls for the HVAC system were tied into the building automation system. This design also included architectural changes to the rooms, the addition of anti rooms and changing rooms for the lab owners. This also required modifications to the power, communication and data distribution systems within the building based on the new layout.