OBJECTIVE
Renovate existing labs and associated infrastructure within a state of the art research and development laboratory facility
HIGHLIGHTS
The complete renovation of the HVAC, power, communication and data distribution systems within the building based on the new layout and the requirements of the labs. The equipment and casework was also designed and specified to be mobile and allow the lab owners the flexibility of changing the layout based on their needs. Design included a CV supply and exhaust air system with high purity gases for HPLC’s and Biosafety Cabinets.