Laser Chiller Installation

OBJECTIVE

Provide the engineering design package to install a new laser chiller system in an existing research lab.

HIGHLIGHTS

The highlights of this project included the engineering and design required to install a new laser chiller system in an existing research lab. The equipment had already been purchased by the Facility and needed to be modified in order to install the equipment in the area/room selected.

LOCATION

Pennsylvania, Healthcare Facility

PROJECT SIZE

$680,000

SERVICES:

  1. MEP Engineering
  2. Construction Assistance
Back to all projects

Contact

465 Maryland Drive, Suite 100
Fort Washington, PA 19034

Engage

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industrys standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

Ⓒ Javan Engineering Inc., 2021. All Rights Reserved.

Privacy Settings
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy
Youtube
Consent to display content from Youtube
Vimeo
Consent to display content from Vimeo
Google Maps
Consent to display content from Google