OBJECTIVE
Convert line to metric size laminated shingles; Increase plant capacity; Upgrade utility infrastructure
HIGHLIGHTS
Project converted plant laminated shingle size to metric and increased capacity. Our scope included new power runs, grounding, and lighting/receptacles. Structurally was documenting existing plant columns/ trenching layouts, truss repairs, moving columns, E-House Support, and wall modifications. Mechanically documented existing Raw Material piping, and modifying all production for metric size laminated shingles upstream and down from RDI’s scope. This also included modifications to the Coater, Tape Applicator, Blender, Sand System, and Wrappers that consisted of forty-three (43) different components such as belt conveyors, lug conveyors, bundle squaring wheels, unwind stand, paper knife, corner conveyors, kicker conveyors, and gravity roller conveyors.