MON Project Utilities Supply and Upgrade

OBJECTIVE

Install RTO and cryogenic; upgrade utility infrastructure

HIGHLIGHTS

Project installs a new Regenerative Thermal Oxidizer (RTO) and Cryogenic Unit at the customer’s existing plant. Specifically, this design/build project provided utilities consisting of the following services: natural gas, compressed air, well water that served as process water, potable water, connection to an on-site chemical drain, electrical service, and fire protection. The electrical upgrade portion of the project included a new Unit Substation with a walk-in enclosure. The unit sub consisted of an electrically operated primary means of disconnect, a transformer, and a secondary distribution.

LOCATION

New Jersey

PROJECT SIZE

$25 million

SERVICES:

  1. Project Scoping and Estimating
  2. Mechanical Engineering and Design
  3. Civil/Structural Engineering and Design
  4. Electrical Engineering and Design
  5. On-Site Project and Construction Management
Back to all projects

Contact

465 Maryland Drive, Suite 100
Fort Washington, PA 19034

Engage

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industrys standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

Ⓒ Javan Engineering Inc., 2021. All Rights Reserved.

Privacy Settings
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy
Youtube
Consent to display content from Youtube
Vimeo
Consent to display content from Vimeo
Google Maps
Consent to display content from Google