OBJECTIVE
Install RTO and cryogenic; upgrade utility infrastructure
HIGHLIGHTS
Project installs a new Regenerative Thermal Oxidizer (RTO) and Cryogenic Unit at the customer’s existing plant. Specifically, this design/build project provided utilities consisting of the following services: natural gas, compressed air, well water that served as process water, potable water, connection to an on-site chemical drain, electrical service, and fire protection. The electrical upgrade portion of the project included a new Unit Substation with a walk-in enclosure. The unit sub consisted of an electrically operated primary means of disconnect, a transformer, and a secondary distribution.