Pressure Relief Device Project

OBJECTIVE

The client was building a greenfield vaccine drug substance facility and utilized our pressure relief device group to conduct/prepare all pressure relief calculations and packages for both stick-built and vendor provided relief devices. Additionally, our team conducted all post installation field walkdowns and coordination with installers for mitigations. Processes analyzed involved Solution Prep, Fermentation, Harvest, Purification, Bulk Filling and all support equipment/utilities including Autoclaves, WFI, CIP, Clean Steam, Solvent Storage/Distribution, and plant utilities.

LOCATION

North Carolina

PROJECT SIZE

$700,000,000

SERVICES

Pressure Relief Analysis, Sizing and Packages

Back to all projects

Contact

465 Maryland Drive, Suite 100
Fort Washington, PA 19034

1800 Pennbrook Parkway, Suite 102
Lansdale, PA 19446

3000 RDU Center Drive, Suite 117
Morrisville, NC 27560

Engage

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industrys standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

Ⓒ Javan Engineering, A CHA Company, 2023. All Rights Reserved.

Privacy Settings
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy
Youtube
Consent to display content from Youtube
Vimeo
Consent to display content from Vimeo
Google Maps
Consent to display content from Google